Mumbai Airport Runways To Remain Shut for Six Hours for Pre-Monsoon Maintenance Work, Check Date and Time for Closure
In view of pre-monsoon maintenance work, the runways at Mumbai Airport will remain shut for six hours on May 2. According to reports, the temporary closure of runways at Mumbai Airport will be from 11:00 am to 5:00 pm on May 2. Meanwhile, a NOTAM (Notice to Airmen) has already been issued in this regard. After maintenance work, all operations at Mumbai Airport runways will resume as usual from May 2 post 5:00 pm. Mumbai Airport Issues Travel Advisory, Check Guidelines for Domestic and International Travellers.
Mumbai Airport Runways To Remain Shut for 6 Hours
Mumbai Airport runways to remain shut for 6 hours on May 2 for pre-monsoon maintenance work. The temporary closure will be from 11:00 am to 5:00 pm and a NOTAM (Notice to Airmen) has been issued in this regard. All operations will resume as usual from 2nd May post 5:00 pm
— ANI (@ANI) April 4, 2023
Mumbai Airport Issues Advisory for Passengers
On 2nd May, both the runways of #MumbaiAirport will remain temporarily non-operational on the account of pre-monsoon maintenance and repair work from 11:00 hrs to 17:00 hrs.
Passengers are requested to check with their respective airlines about their scheduled flights. pic.twitter.com/My4q5e0DiJ
— CSMIA (@CSMIA_Official) April 4, 2023
(SocialLY brings you all the latest breaking news, viral trends and information from social media world, including Twitter, Instagram and Youtube. The above post is embeded directly from the user’s social media account and Today News 24 Staff may not have modified or edited the content body. The views and facts appearing in the social media post do not reflect the opinions of Today News 24, also Today News 24 does not assume any responsibility or liability for the same.)